Measured quantity
Quantity is a measurement of a physical entity in units that depend on the nature of that entity. Therefore, quantity indicates how much of something exists, existed or will exist.
In construction, ‘measured quantities’ typically form part of a bill of quantities (BoQ) and indicate how much of something will be required to construct a building or part of a building.
Usually prepared by a quantity surveyor (QS), the BoQ provides project-specific, measured quantities of the items of work identified by the drawings and specifications (which form part of the tender documentation). For example, in a traditional building, the BoQ will contain measured quantities for each item that goes to make up the final construction e.g bricks, doors, ironmongery, floor tiles, roof slates, etc. This means that potential tenderers know exactly how much of a given quantity will be required for the work and so they can price for it. This creates a level playing field as all tenderers are pricing for the same measured quantities which allows the client to make easy comparisons between the bids.
Measured quantities are typically expressed in number (e.g door handles), length (e.g handrails, kerbs), area (e.g floor tiles, plaster), volume (e.g concrete) or weight (e.g gravel).
When prices have been entered by a tenderer beside each measured quantity in a BoQ, this constitutes the tenderer’s offer.
Not providing measured quantities would require that the various tenderers on a project ‘take off’ the quantities themselves. With numerous tenderers with possibly different methodologies, as well as human error creeping in, the quantities taken off would vary, thus making the client’s job in comparing the tenders that much harder.
The New Rules of Measurement (NRM) are published by the Royal Institution of Chartered Surveyors' (RICS) Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes; NRM1, NRM2 and NRM3.
Fore more information see: New rules of measurement.
In some circumstances, it may be difficult to determine exact quantities, for example early in the development of a project. In this case approximate quantities may be estimated. These should be accompanied by a schedule of the assumptions made in determining the approximate quantities.
For more information see: Approximate quantities.
[edit] Related articles on Designing Buildings Wiki
- Approximate quantities.
- Bill.
- Taking off construction works
- Bill of quantities breakdown structures BQBS
- Types of bill of quantities
- Standard Method of Measurement SMM7
- Preliminaries in construction
- Schedule of rates for construction
- Bill of quantities software
- Tender documentation for construction projects
- Approximate bill of quantities
- How to take off construction works
- Specification for construction
- Advantages of a bill of quantities
- New Rules of Measurement
- Typical tender process for construction projects
- Priced bill of quantities
- All-in rates
- Common mistakes in bill of quantities
- Bill of quantities v Schedule of rates
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.